Rubix Compute: Power Requirements and Wiring
Power Supply Requirements
Power Supply Wiring
The Nube-iO Rubix Compute Gateway Controller is powered by a 24v AC or DC power supply on the `24 AC/DC POWER` terminals as shown below.
Wiring Diagram:
Related Articles
Rubix Compute: Legacy Power Requirements and Wiring
WARNING: This article is intended for Rubix Compute devices version 0.8 and below. To determine the device version of Rubix Compute, see: Rubix Compute: Identifying Hardware Version Power Supply Requirements Power Supply Wiring Versions 0.8 and below ...
Rubix IO: Power Requirements and Wiring
Power Supply Requirements Power Supply Wiring The IO Module is powered by a 24v AC or DC power supply on the `24 AC/DC POWER` terminals as shown below. Wiring Diagram: Related Articles Edge28: Power Requirements and Wiring Rubix Compute: Power ...
Edge iO 28: Power Requirements and Wiring
Power Supply Requirements Supply Voltage 24v AC/DC Current Requirement 700 mA Minimum Transformer Size 17 VA Power Supply Wiring The Edge28 can be powered by 24 volts AC or DC. The 0v wire from the power supply should be connected to the ...
Rubix Compute: Identifying Hardware Version
The Rubix Compute has had a number of hardware improvements since its release. It is important to know which version of the Rubix Compute you are working with so that the correct verions of manuals and documentation are used. Using mismatched ...
Rubix Compute: Modbus RS485 Wiring
Modbus RS485 Terminal Wiring To establish communication with Modbus RS485 devices, the RS485 connectors are terminated and installed as shown below. Modbus RS485 Networking When Networking multiple devices on an RS485 network, each ...